Cochran Basin Stormwater Control Vault
Construction of a below grade concrete cast in place flow control structure. A below grade cast in place capacity stormwater pump station, with electrical facilities, including submersible stormwater pumps, motor controls, and force main piping.
NSC Rowan Force Main & Water
Construction of steel casing, ductile iron force main, water main, sanitary sewer main, storm sewer, and HMA pavement.
Dayton Pond Intake Facility Weir Repair
Construction and renovation of the US Fish and Wildlife Service Dayton Pond Intake Facility.
Erie & Trent Storm Facility
Excavation and embankment, 6” water main, 8” to 72” storm sewer, drainage structures, geomembrane lined bioinfiltration swale, stormwater duplex lift station with control, asphalt pavement, sundry utility adjustments, contaminated soil remediation.
Riverside Avenue - Monroe to Division
Construction of water line, pavement repair, wheelchair ramp replaement and adjustments.